top of page


1. Introduction


1.1. Introduction



2. Overview of Industrial Systems


2.1. Costs and Overview



3. The furnace-chiller industrial system


3.1. The natural gas furnace-chiller system


3.2. Forward contracts for natural gas purchases


3.3. Heating and cooling demand




4. The furnace - chiller - transformer industrial system


4.1. Introduction


4.2. Electricity demand


4.3. Python modelling


4.4. Solution in Python


4.5. GAMS modelling




5. The furnace - chiller - transformer - Storage - CHP (combined heat and power) industrial system


5.1. Introduction


5.2. Python modelling


5.3. Solution in Python


5.4. GAMS modelling




6. The furnace - chiller - transformer - Storage - CHP - EHP (electric heat pump) industrial system


1. Introduction


2. Python modelling


3. Solution in Python


4. GAMS modelling

7. Conclusions


7.1. Conclusions

Group 591 (1).png
Group 589_edited_edited_edited_edited_edited_edited.jpg
© 2026 Dr Spyros Giannelos
London, United Kingdom
spyros@spyrosgiannelos.com
Privacy Notice 
bottom of page