About
The total video duration is 1 hour, 28 minutes, 40 seconds. Prerequisites: None Duration: 1 hour, 29 minutes Course Description: The course teaches how to model electricity transmission lines that can be switched on/off (switchable lines). The implementation is in Python and GAMS. The optimization model will be applied to a realistic 118-bus electricity transmission system. The strategic opening or closing of transmission lines is crucial for the operation of electricity grids.
Overview
2. Modelling in Python
.9 steps
3. Modelling in GAMS
.1 step
4. Conclusion
.1 step


