top of page


1 Overview


1.1 Intro


1.2 slides


1.3 What is the Soft Open Point


1.4 What are smart EV chargers


1.5 Key points of the study




2 Description of the case


2.1 System topology


2.2 Uncertainty and scenario tree


2.3 The build-time (delay) concept




3 Running the study for Soft Open Points


3.1 Setting up the study


3.2 Running the study




4 Running the study for Smart EV Chargers


4.1 Step-by-step guide




5 Conclusions


5.1 Overview

Group 591 (1).png
Group 589_edited_edited_edited_edited_edited_edited.jpg
© 2026 Dr Spyros Giannelos
London, United Kingdom
spyros@spyrosgiannelos.com
Privacy Notice 
bottom of page