top of page


1 Overview
1.1 Intro
1.2 slides
1.3 What is the Soft Open Point
1.4 What are smart EV chargers
1.5 Key points of the study
2 Description of the case
2.1 System topology
2.2 Uncertainty and scenario tree
2.3 The build-time (delay) concept
3 Running the study for Soft Open Points
3.1 Setting up the study
3.2 Running the study
4 Running the study for Smart EV Chargers
4.1 Step-by-step guide
5 Conclusions
5.1 Overview
bottom of page